Captain Sir Thomas Moore Gym
Medway Maritime Hospital
About this Project
Drakemoor were employed to completely remove an existing hydrotherapy pool and recreate the space into a new staff gym. These works were funded by the Captain Sir Thomas Moore charity with the gym being named after him in his honour.
The works comprised of stripping out various fixtures and fittings, structural alterations, ceiling and partitioning works, making good and decorating affected walls and woodwork, carpentry, new floor finishes throughout, electrical modifications and installations, new sanitaryware with adaptions to existing pipework and drainage, glazed partitions, upgrading fire alarm system, mechanical cooling and the installation of lockers and mirrors.